Panel & Service Upgrades
Electrical Panel Upgrades in Stockton & Northern California
Your panel is the heart of your home's electrical system. If it's full, outdated or one of the brands known to fail, an upgrade makes the whole house safer and gives you room for EV chargers, heat pumps and new circuits.
- Licensed C-10 #1149483
- 40+ years of experience
- Permits & inspections handled
- Complimentary estimates
Signs
When to call
- Breakers trip often, or lights dim when the AC or dryer starts
- Federal Pacific Stab-Lok, Zinsco or fuse panel
- No open spaces left for new circuits
- Panel feels warm, buzzes, or shows rust or scorch marks
- You're adding an EV charger, heat pump, spa or ADU
- Insurance or a home inspection flagged the panel
Scope
What we do
- Panel replacement (same location or relocated)
- Service upgrades to 200A, 225A, 400A and beyond
- Meter and main combination upgrades
- Subpanels for garages, shops and ADUs
- Whole-home surge protection
- Load calculations and utility service applications

Process
How it works
- We look at the panel, the service and what you want to add, then run a load calculation.
- You get a written price before any work starts. No surprises.
- We pull the permit and file the service application with PG&E, MID, SMUD or Lodi Electric.
- Install day: power is usually off for part of one day. We label every circuit.
- We pass the inspection and coordinate the utility reconnect.
Pricing
What affects the price
Every job gets a written price before work starts, and estimates are always complimentary. These are the things that move the number.
- Panel replacement only vs. a full service upgrade
- Whether the meter or service entrance has to move
- Overhead vs. underground service
- Number of circuits that need to be reconnected or corrected
- Utility requirements and permit fees in your city
Questions
Electrical Panel Upgrades FAQs
How do I know if I need a panel upgrade?
If your panel is a Federal Pacific, Zinsco or fuse panel, is full, trips often, or you're adding a big load like an EV charger or heat pump, it's time to have it looked at. We'll tell you honestly whether you need a new panel, a service upgrade, or neither.
How long does a panel upgrade take?
The install itself usually takes one day. The longer part is the utility: a service upgrade needs an application and a scheduled reconnect, which can take a few weeks depending on PG&E, MID, SMUD or Lodi Electric. We manage that timeline for you.
Do you pull permits?
Yes, every time. Panel and service work requires a permit and inspection in every city we serve. We're licensed under CA C-10 #1149483.
Is a 200-amp service enough?
For most homes, yes, even with an EV charger. Homes adding several large loads (EV, heat pump, induction range, spa, ADU) may need more, or a load-management device can avoid an upgrade. A load calculation settles it.
Are Federal Pacific and Zinsco panels really dangerous?
Both have a long track record of breakers that fail to trip under overload. We recommend replacing them rather than repairing them.
Service area
Electrical Panel Upgrades near you
Based in Stockton, serving Northern California.
Related services
EV Charger Installation
Level 2 home chargers for Tesla, Ford, Rivian and every other EV, on a dedicated circuit, permitted and inspected.
Learn more →Whole-House Rewiring
Replace knob-and-tube, aluminum and worn-out wiring with modern, grounded circuits, with minimal wall openings.
Learn more →Generators & Backup Power
Whole-home standby generators, transfer switches and portable generator inlets for PG&E outages and shutoffs.
Learn more →Ready for electrical panel upgrades?
Call for a straight answer and a written price, or book a complimentary consultation online.
